Buying a new turbine is a project, not a purchase
A new gas turbine generator touches fuel gas, cooling, controls, emissions and the grid. Buyers write to USP&E when they want those pieces specified together, so the bids they receive can be compared like for like.
If surplus or used units could fill the gap sooner, the USP&E inventory shows what is available now.
Get in touch
Request a callback
Leave your details and an engineer will call you back about your turbine requirement.
Contact form ›Information that sharpens the answer
- Required output in MW, and whether the grid is 50 or 60 Hz.
- Fuel gas pressure and composition.
- Site altitude and the hottest ambient temperature you design for.
- Emissions limits in your permit.
- The window in which the turbine must arrive and run.
Useful reading before you write
Our offices
USP&E works from six offices in the USA, the UK, South Africa and China, and is certified to ISO 9001 and ISO 45001.
Colorado Springs
1755 Telstar Dr, Suite 300, Colorado Springs, USA
Knoxville
800 S Gay St, Suite 700, Knoxville, USA
London
162-168 Regent Street, London, UK
Johannesburg
22 Kildoon Rd, Bryanston, South Africa
Cape Town
31 Brickfield Road, Woodstock, South Africa
China
No. 1 Ningzhou Road, Wuxi, China
Certified and accountable
USP&E can carry a turbine package from specification through EPC to operation and maintenance, so the party that sold you the machine is also accountable for how it performs.
Racing a go-live date?
Call +27 10 822 2324 or email info@uspeglobal.com with your load, fuel and timeline.
