New Gas Turbine Generators · USP&E
Powering New GT Packages.Built for the Frontier.
Package buyers: send New Gas Turbine Generators the site.
How we work
One partner. Complete accountability.Scope
Tell us your load, fuel, frequency (50 or 60 Hz) and target date.
Engineer & deliver
We specify the right equipment and execute EPC through commissioning.
Operate
Our O&M teams run and maintain the plant with Extreme Ownership for the life of the asset.
Case studies
New Gas Turbine Generators results on record
Major US hyperscale developers
Data center power · Refurbishment
Seven GE Frame 6B gas turbines refurbished to zero hours, in-house, by USP&E.
Talk to the team
Mining Power Station Refurbishment in Mali
O&M contract · Barrick
104 MW power station refurbishment achieving 300% reliability improvement for Barrick Gold.
View case study
Perseus Mining · Nyanzaga Gold Project, Tanzania
Mining power · Asset supply
28 Cummins KTA50 containerised gensets, 1,275 kVA each, supplied by USP&E to power the mine.
Talk to the teamWhat we bring
New Gas Turbine Generators engineers, not equipment brokersNew Gas Turbine Generators stays brand-neutral. Package buyers get the right new gas turbine generator packages.

Global reach, local teams
Local New Gas Turbine Generators support worldwideUSA | AFRICA | UK | UAE | CHINA
Buying questions, answered
FAQWhat does New Gas Turbine Generators focus on?
New Gas Turbine Generators centres on new gas turbine generator packages. For package buyers, USP&E handles new gas turbine generator packages from survey onwards.
Why write a fuel gas spec before buying new GT packages?
USP&E writes the fuel gas specification first because the factory uses it to choose combustion hardware and tune controls. A specification built on measured gas avoids late conditioning skids, tuning problems and commissioning delays, so your new turbine arrives ready to burn the gas you actually have.
Do natural gas engines still matter on a new GT site?
USP&E keeps natural gas engines in many new turbine designs for black-start, essential loads and part-load periods. Engines tolerate wider gas variation and start quickly, which complements large turbines and keeps your site supplied during turbine maintenance and inspections, so gas turbine generators never carry the whole load alone.
How do AI gas turbines and compute loads change the gas spec?
USP&E finds that AI gas turbines and compute loads raise gas demand and make stable supply even more critical. The specification and conditioning must cover larger flows, faster load changes and tighter monitoring, so every turbine block receives consistent fuel as compute halls come online.
What does balance-of-plant include for a new gas turbine?
USP&E defines balance-of-plant as everything your turbine needs beyond the skid: foundations, fuel gas conditioning, transformers, switchgear, protection, cooling, fire systems, compressed air, auxiliary power and controls integration. Each item needs a named supplier so nothing falls between scopes during construction.
Racing a go-live date?
Let’s talk about how USP&E can help. Call +27 10 822 2324 or email info@uspeglobal.com.